This part was originally made by joint welding two components, but the welding stability was not high and 8% defect rate was reported. Due to repeated customer complaints, we improved the process based on customer¡¦s application need.

   According to the application, we adopted clinching process and preserved a space for punching hole in the plate. We redesigned the stud from cutting process to cold forging and preserved tolerances for pressing.

   Through prototype testing, we found both the tensile strength and application function meet customer¡¦s requirements. So we phased into mass production. By this re-engineering, we saved 42% for our customer and reduced the defect rate to 0.25%. Our customer is very happy with the new design.



¡@
Engineered Solution for Upper cover ..

¡@

¡@ ¡@

¡@

   ¡@

 

¡@
¡@
¡@
¡@
¡@
¡@

¡@ ¡@ ¡@
 

¡@

¡@

¡@

¡@

¡@

¡@

¡@

¡@

Ace Components Enterprise
¡@
No.1 Hsiang-Pei Rd. Hsin-Chu 300,Taiwan
E-mail:ace@acece.com.tw
TEL:886-3-5304000                                 Copyright © 2004 By Ace Components Enterprise.
FAX:886-3-5403000                                                    | Terms of Use | Security Policy |
¡@